The aim of the meeting is to finalize the strategy for the experiments
protection from beam failures, discuss its implementation and commissioning. In
particular, the meeting will address the following points:
-
gather all available information on studies regarding
experiment protection from beam failures
-
define what further simulation studies are needed if any
-
create an overview of the current strategy(ies) for the
experiment protection, verify the coherence among the different strategies
and eventually modify them if necessary
-
discuss the the implementation and the commissioning of the
protection system
-
introduce the person responsible, in each experiment, for
the coordination of all activities regarding the protection of the detectors
from beam failures (BISU, Beam Interlock SUpervisor)
Points to be addressed by the machine:
-
briefly review the general strategy for the
machine/experiment protection
-
briefly review the Beam Interlock System (BIS)
-
present the LHC commissioning plans and the expected routine
LHC cycle (from pilot injection to dump)
-
present in detail the beam failures scenarios emphasizing
those that are riskier for the experiments and, if possible, give
back-of-the-envelope estimations for other (non simulated) scenarios
Points to be addressed by each experiment:
-
qualify the most sensitive sub-detector damage levels (for
example MIP/mm2 or MIP HZ/mm2) for the high voltage ON/OFF cases
-
define what beam losses can be considered safe for the
experiment (in particular, the maximum beam intensity which can be lost in
the experimental area in one turn with detectors OFF, i.e. beam lost because
of injection errors)
-
study what information the experiment can provide to the
machine if the injected beam is lost in or near the experimental area
-
review the beam failures scenarios considered and the
simulation studies performed
-
report on the general strategy for the protection against
beam losses
-
report on the implementation of this strategy and the use of
the injection inhibit and BIS:
-
what detectors will participate in the protection
against beam failures?
-
what are the interlock actions?
-
what are the parameters, the criteria and thresholds for
taking actions?
-
what expected availability, reliability, efficiency?
-
how many inputs to the local BIC? maskable / non
maskable ?
-
post-mortem analysis capability for beam dump.
Post-mortem analysis only if the experiment has triggered a beam dump or
for any triggered beam dump?
-
power back-up strategy: behavior in case of local/global
power cuts?
-
commissioning
Points that need not and should not be covered:
|
Chairpersons |
Massimiliano
Ferro-Luzzi, Rüdiger Schmidt, Jörg Wenninger |
|
Organizing Committee
|
Massimiliano
Ferro-Luzzi, Daniela Macina, Rüdiger Schmidt, Detlef Swoboda, Jörg Wenninger |
|
Secretariat of the
Workshop |
Christel Paris |
|